ERP migration tie-out checklist: reconcile job cost and WIP between old and new
By the Junction team · Published 18 November 2026 · 5 min read
The short answer
- A tie-out proves the new system holds the same numbers as the old one at the cutover date, before anyone retires the old one.
- Twelve checks cover the ledger, payables, receivables, each open job's cost, commitments and billing, retainage, WIP and unmapped cost codes.
- Ask both systems the same question and log every difference with its cause, because most gaps trace to cost code mapping, timing or status.
Migration vendors will tell you the data loaded. A controller needs to know it is right. A tie-out is the proof: the same figures, from both systems, at the same date, with every difference explained. This checklist is written for construction, where a job's numbers span cost, commitments, billing and retainage.
What is a tie-out and who signs it off?
A tie-out compares a figure in the new system with the same figure in the old one at the cutover date and records whether they agree. The accounting team usually does the comparison, and the CFO or controller decides whether any remaining variance is acceptable before the old system is retired.
One ERP vendor's playbook describes the same split: accounting closes the period in both systems and reconciles, and the CFO or controller makes the go or no-go call on variances (DualEntry). It also warns that many migrations stop at opening balances and call it done, which in construction leaves job-level figures unchecked.
What are the twelve checks?
The twelve checks run from the top of the books down to each job: the closing trial balance, payables and receivables against their ledgers, then each open job's contract, cost, commitments, billing and retainage, then the WIP schedule, payroll totals and any cost code that failed to map. Together they catch most errors.
| # | Check | Compare | Tie means |
|---|---|---|---|
| 1 | Opening balances | New opening balances against the old closing trial balance at the cutover date | Every account agrees, or a documented difference remains |
| 2 | Payables | Open payables in the new system against the old payables ledger total | Totals agree, then vendor by vendor |
| 3 | Receivables | Open receivables against the old receivables ledger total | Totals agree, then customer by customer |
| 4 | Cash | Cash balance against the last bank reconciliation | Agrees to the reconciled balance |
| 5 | Open job list | Count and status of open jobs in each system | Same jobs, same status, none missing or doubled |
| 6 | Contract values | Original contract and approved changes per open job | Same revised contract per job |
| 7 | Cost to date | Posted cost per job, by cost code group | Same total per job, and per group |
| 8 | Committed cost | Open subcontracts and purchase orders per job | Same committed and invoiced to date |
| 9 | Billed to date and retainage | Billings, retainage held and retainage payable per job | Same billed and retainage per job |
| 10 | WIP schedule | Rebuild the schedule in the new system and compare with the last old one | Same percent complete and over or under billing, or explained |
| 11 | Payroll totals | Year-to-date totals for the cycles you compared | Agree, or differences explained (a practice step: confirm with your payroll adviser) |
| 12 | Unmapped cost codes | Codes with cost in the old system that have no match in the new one | None left unexplained |
Checks 1 to 4 follow the pattern in the playbook above: opening balances equal the legacy trial balance, open payables and receivables equal their ledgers, and cash equals the last bank reconciliation. Checks 5 to 12 are the job-level checks a contractor adds, and they are our practice advice rather than anyone's standard.
How do you run the comparison quickly?
Ask the same question of both systems and put the answers side by side. By hand that means running a report in each system and combining them in a spreadsheet. With both connected to an AI assistant through a connector, you can ask once and have each figure labelled with the system it came from.
Questions to ask both systems at the cutover date
- For every open job, list contract value, cost to date, committed cost, billed to date and retainage held from the old system and the new system, and show only the jobs where any figure differs.
- What is the total of open payables in the old system and in the new system, and which vendors differ?
- Which cost codes have cost in the old system but no matching code in the new system?
- Which jobs are open in one system and closed in the other?
What causes differences, and how do you log them?
Most differences come from four causes: cost codes that do not line up, items posted either side of the cutover date, jobs or vendors with different status, and rounding or currency settings. Log each difference with its cause, its amount, who found it and who approved it, so the log itself becomes the audit trail.
| Cause | Typical sign | Fix |
|---|---|---|
| Cost code mapping | Cost for a job is right in total but wrong by code | Correct the crosswalk (see mapping cost codes) |
| Timing or cutoff | A few invoices appear in both systems or neither | Agree a cutoff rule and check posting dates |
| Status mismatch | A job is open in one system and closed in the other | Agree the status rule and correct one side |
| Settings | Small differences on many lines | Compare rounding, retainage and tax settings |
The wider process is in the cutover checklist for construction controllers. For why jobs that straddle the cutover cause most problems, see WIP history for your surety.
Frequently asked questions
- How do you reconcile job cost after an ERP migration?
- Compare each open job's contract value, cost to date, committed cost, billed to date and retainage between the old and new systems at the cutover date, and log every difference with its cause. Then rebuild the WIP schedule and compare it too.
- What is a parallel close?
- It means closing the same period in both the old and new systems side by side and reconciling the results before the old system is retired. Finance guides commonly describe closing one period this way.
- Who should sign off an ERP migration tie-out?
- Accounting does the comparison and the CFO or controller decides whether remaining variances are acceptable. Record the sign-off with the date, because an auditor or surety may ask later.
- Why do job cost totals differ after migration?
- The usual causes are cost codes that map differently, items posted either side of the cutover date, jobs with different status, and settings such as rounding and retainage. Compare by cost code group to find which.
- How many checks should a migration tie-out include?
- There is no standard. The twelve here cover the ledger, payables, receivables, cash and the job-level figures a contractor depends on. Add checks for anything your auditor or surety asks about.