Junction

What job cost data to migrate to a new ERP, and what to leave behind

By the Junction team · Published 18 November 2026 · 5 min read

The short answer

Scope is where migrations go wrong in both directions. Move too little and a project manager cannot see last year's cost report. Move too much and you pay to map, clean and prove ten years of data nobody will open. This guide gives you a way to decide, category by category.

What must move to run the business on the new system?

Three things must move: master data such as vendors, customers and cost codes, open balances such as starting ledger balances and unpaid payables and receivables, and the open jobs with their contracts, commitments and cost to date. Without them the new system cannot pay a bill or send an invoice on day one.

One consulting firm sorts the data the same way, into master data, open balances and history, and says the open balances must move (RSM). In construction, add retainage, committed cost on open subcontracts and purchase orders, and billing to date, because jobs do not stop at cutover.

How much history should you migrate?

Migrate the history people will use weekly, and keep the rest reachable. A Sage consulting partner says historical data migration usually consists of two years of data, which shows a limited window is normal. Pick your own window by asking what comparisons, reports and requests need history in the new system.

The same firm says a whole move can have you up and running in three to six months (Baker Tilly). Each extra year of history adds mapping, cleaning and proving work on top of that, so every year you load should earn its place.

CategoryMove it?WhyIf it stays behind, how do you ask?
Vendors, customers, cost codesYes, cleanedThe new system cannot work without themKeep the old code list; map it (see the cost code mapping guide)
Open balances (ledger, payables, receivables)YesYou pay and bill from day oneTie to the old closing trial balance
Open jobsYes, with cost to date and commitmentsWork and billing continueCompare both systems for these jobs until they close
Recently closed jobsA window you chooseUsed for estimating and comparisonQuery the old system for older years
Older closed jobsUsually noCostly to map for rare useKeep reachable, with permissions
Payroll historyYear to date, plus what filings needReports and filings need continuityConfirm needs with your payroll provider and advisers
Documents and attachmentsDecide separatelyOften live outside the ERPNote where they are and who can reach them

What should you ask your auditor and surety first?

Ask what they need to see, for which periods, and in what form. Retention and bonding requirements vary by company, contract and place, so no guide can set them for you. Their answers decide how much history must be easy to reach, and they are far cheaper to get before cutover than after.

  1. Which years of job cost and WIP will you ask for, and how often?
  2. Is a copy of the old data acceptable, or do you need the original system or a certified extract?
  3. What continuity do you expect between old and new figures on jobs that straddle the cutover?
  4. Who may see the old data, and does access need to be logged?
  5. How long must the old data be kept, and in what form?

How do you reach the data you leave behind?

Decide the route when you decide the scope, not after. Leave-behind data needs an owner, a place to live, a way to ask questions and a permission rule. The usual routes are a stored extract, a searchable archive, a warehouse copy or a live connection, compared in how to keep access to legacy construction data.

A live connection suits data people still compare against new work: the assistant reads the old system and the new one when asked, so history does not have to be loaded to be useful. See how to report across old and new ERP.

Frequently asked questions

How many years of history should I migrate to a new ERP?
There is no standard. A Sage consulting partner says two years is usual for one move, but your window should follow what people compare and what your auditor and surety need. Keep older years reachable rather than loading them by default.
Do I have to migrate closed jobs?
Not all of them. Open jobs must move or be finished in the old system. Closed jobs are a choice: load a recent window for comparison and keep older ones queryable in the old system.
What is the minimum data needed to go live on a new ERP?
Master data, open balances and open jobs with their commitments and cost to date. Without those the new system cannot pay or bill correctly, whatever history you add.
Should I migrate payroll history?
Year to date is usually needed for reports and filings, but needs vary. Confirm with your payroll provider and advisers, and keep older payroll history reachable and tightly permissioned.
Can I leave old data in the old system and still report on it?
Yes, if it stays available. Reports can run from the old system, or an AI assistant can ask it through a connector alongside the new one, within each person's permissions.

Sources

Ask your AI about your own systems

Junction connects the systems your teams run, from construction ERPs to ad platforms, to Claude, ChatGPT, Gemini and Copilot. Connect in minutes.