Junction

How to access Dynamics GP history after you migrate, and report across old and new

By the Junction team · Published 18 November 2026 · 6 min read

The short answer

Moving off Dynamics GP raises one practical worry: where does ten years of history go, and who can still ask it a question? This guide goes through the options a consulting firm lists, adds the live-connection option beside them, and works one made-up example of double counting.

What are the ways to keep Dynamics GP history accessible?

RSM, a consulting firm that also sells services in this area, lists these routes: keep the GP database server online with reporting tools, move it to the cloud, use a data lake, share saved lists and queries, set up refreshable Excel connections, give Power BI access through an API, or embed views in the new ERP. Everything below attributed to RSM is its own claim.

RSM calls Azure Data Lake "a common option" and recommends extracting history to a cloud data store, exposed through configurable lists with role-based security, so the on-premises GP servers can be retired (RSM). The columns below are our reasoning, not RSM's.

OptionEffort to set upHow freshCopies of dataWho sees what
Keep the GP server online with reporting toolsLow to start; you keep running the old serverFrozen at the last GP entryNone newSet by the reporting tool and the old server's own logins
Move that server to the cloudModerate: a hosting moveFrozenOne moved copyCloud logins plus the old rules
Data lake or cloud data storeHigher: extract, load, build listsAs of the last extractA second copy to secureRole-based lists you build
Saved lists and queries, shared or sent to ExcelLowAs of each runEvery Excel file is a copyWhoever holds the file
Refreshable Excel connections or Power BI through an APIModerateAs of the last refreshHeld in the workbook or reportSet by the connection and the report
Views embedded in the new ERPModerate to higherFrozen history beside live dataHistory is copied inThe new ERP's roles
Live connection from an AI assistantLow: connect, set rolesCurrent at each questionNone keptRoles per person, in one place

What has to move to the new system, and what can stay behind?

RSM sorts data into master data, open balances and historical data, and says open balances must move. Those are starting general ledger balances and unpaid receivables and payables. Master data such as vendors and accounts is the base. History is the part you can choose to leave in the old system.

GroupExamplesWhat RSM saysOur practical note
Master dataVendors, customers, accounts, jobsOne of its three groupsDecide which to carry: a vendor not paid in years may not need to move
Open balancesStarting GL balances, unpaid receivables, unpaid payablesMust moveTie them to the closing trial balance before you retire anything
Historical dataClosed jobs, paid invoices, past years of transactionsRecommends extracting history to a cloud data storeChoose how far back the new system needs, and reach the rest another way

For the construction side of this choice, see what job cost data to migrate and what to leave behind.

How do merge views blend old and new, and what is double counting?

A merge view joins old history and new transactions into one report. Double counting happens when the same amount sits in both, for example when a balance is loaded into the new system and the old transactions behind it are also read. RSM says a unified approach needs transparent controls that prevent it.

RSM describes two usual rules: a date-based cutover, or transaction-level rules. Here is a made-up example, with invented numbers, to show why the rule matters. A job called Maple Street Fit-out has $412,000 of cost in the old system up to 30 September. The new system starts on 1 October.

Made-up figureAmountSource
Cost up to 30 September$412,000Old system
Cost from 1 October$138,000New system
Opening balance loaded into the new system on 1 October$412,000New system, a carried-forward balance
Correct total cost (old up to 30 September plus new transactions from 1 October)$550,000$412,000 + $138,000
Wrong total (old history plus the new system's full figure)$962,000$412,000 + ($412,000 + $138,000)

The wrong total is $412,000 too high. A date rule fixes it: read the old system up to 30 September and the new system from 1 October, and never mix the loaded balance in. Whatever rule you pick, write it down so every report uses it.

How does a live connection compare, and who sees what?

A live connection reads GP and the new system when a question is asked, so nothing is copied and the answer is current for whichever system still takes entries. The old system must stay reachable, and access is set by roles rather than by who holds a file.

  • Roles: decide which people may ask about GP history, which jobs and which fields, before anyone connects.
  • Audit: keep a record of who asked what, names and outcomes, not the figures.
  • Retirement: if you retire the GP server, the live route goes with it, so choose a frozen copy or another route for that day.
  • Date rule: the connector reads each system, but the cutover rule is still yours. Put it in your question.

Questions to ask across GP and the new system

  • For jobs that were open at 30 September, show cost from the old system up to that date and from the new system after it, and give one total for each job.
  • List vendors with unpaid invoices in GP at the cutover date and show whether each has the same balance in the new system.
  • Compare closing account balances in GP at the cutover date with the opening balances in the new system, and list any differences.

The wider pattern is in report across old and new ERP during migration, the trade-off between copying and asking is in data warehouse vs live query, and how to keep the old data reachable is in keep access to legacy construction data.

Frequently asked questions

How do I access Dynamics GP history after migration?
RSM lists keeping a GP database server online, moving it to the cloud, a data lake, shared lists and queries, refreshable Excel connections, Power BI through an API, or views inside the new ERP. A live connection to GP is another route if the old system stays available.
Can I retire my Dynamics GP server after moving to Business Central?
RSM recommends extracting history to a cloud data store, exposed through configurable lists with role-based security, so on-premises GP servers can be retired. That is a consulting firm's view. Decide how history stays reachable before you switch the server off.
How do I report across Dynamics GP and a new ERP?
Use a merge view or a live connection that reads both, with a clear cutover rule such as a date. Read GP up to the cutover date and the new system after it, so no amount is counted twice.
What Dynamics GP data has to move to the new system?
RSM says open balances must move: starting general ledger balances and unpaid receivables and payables. Master data supports them, and in our view historical data can stay reachable elsewhere if you choose.
What is double counting in a merge view?
It is the same amount appearing twice, for example a balance loaded into the new system while the old transactions behind it are also read. A date-based cutover or transaction-level rules prevent it.

Sources

Ask your AI about your own systems

Junction connects the systems your teams run, from construction ERPs to ad platforms, to Claude, ChatGPT, Gemini and Copilot. Connect in minutes.